Concrete batching
Your current location: 首 页 > Product center > Template product

Square steel die

2020-05-08 11:13:06
Square steel die
Detailed introduction:

Processor requirement

1、 Steel formworkThe operator of each station in the process must press steelTemplate processingProcess and construction drawings of the material type specifications and size requirements processing。

2, the processing process for the construction of unclear parts should immediately stop the next process processing, must promptly consult the technical personnel at the work site before the next process work。

3. The welding of important and key parts, processes, stations and stress parts of steel formwork in the processing process must be responsible to the individual, and necessary preventive measures must be taken to prevent unnecessary quality rework in the processing of processes and parts with frequent quality problems。

Steel formwork

4, in the process of steel formwork processing, the operator of each station should pay attention to the accidental damage of construction personnel, processing machines and semi-finished products and accessories to be processed, so as to prevent safety in advance。 [1] 

Acceptance reference standard

1, steel formwork acceptance according to the "Highway Bridge construction Technical Code" JTJ041-2000 formwork, support and arch 9.1 "Highway Engineering Quality Inspection and Evaluation Standard" JTJ071-2005, and reference to the processing and production technical requirements provided by the commissioning party as the inspection standards, the finished steel formwork of the finished steel formwork is divided into groups and sub-inspection in turn。

2, steel formwork processing process, process, the whole process of the department, must strictly follow the national standard (composite steel formwork technical specification) GB50214-2001 corresponding to the technical standard operation。

3. The processing shall be conducted in strict accordance with Party A's technical disclosure, and the quality standard produced shall be controlled by the higher standard regardless of the combination standard, and it is strictly forbidden to reduce the processing quality control standard without authorization。


Previous post:Round steel die 22020-05-08
Next post:Rectangular die surface2020-05-08

Recent visit:

Related products

Related news

" class="hidden">汉朝百科